Case Study: Roads & Bridges

Project: CTRL 350

CTRL 350

Location: Rochester, Kent
Client: Union Railways Limited
Contract value: £41.5m

Start: April 2000   Completion: April 2005

Brief Description
Construction of a 1.3km bridge over the Medway including balanced cantilever and incremental launched bridge and a small bridge over the London and Chatham Railway in Kent to carry the Channel Tunnel Rail Link. The award-winning 1.3km Medway Bridge, which was built in a 24m wide corridor, is the most complex prestressed concrete railway bridge in the UK. It was constructed using balanced cantilever and incremental launch techniques.